top of page
Document.jpg

Rural Subdivision 
Infrastructure

Marshall Mount, NSW

Bulk and detailed earthworks, stormwater drainage infrastructure, culvert crossings and environmental rehabilitation.

Region:  Marshall Mount, NSW

​

Scope:   Bulk Earthworks, Road Construction, Stormwater Drainage & Environmental Management

 

Status:   Final works taking place

Marshall Mount 6.png

About the project

APX Civil was awarded the civil construction works for a three-lot rural subdivision at North Marshall Mount Road, Marshall Mount.
 

The project involves extensive site preparation, bulk earthworks, construction of a new gravel access road, stormwater drainage infrastructure and environmental rehabilitation works.

Working across a large rural property, our team has undertaken the necessary civil works to establish practical access and supporting infrastructure for the development.

With construction now approximately 90% complete, the project is progressing through its final stages.

Site Preparation & Bulk Earthworks


Initial works involved site establishment, vegetation clearing, topsoil stripping and preparation of the construction areas. Excavation and site regrading were undertaken to establish the required ground levels for the new access road and associated drainage infrastructure.
 

Our team carried out bulk excavation, material placement, compaction and batter trimming, working with the property's existing terrain to achieve the specified design levels. Suitable excavated materials were reused where appropriate, helping to minimise unnecessary material movements across the site.

Access Road Construction


A major component of the project involved constructing a new gravel access road to service the rural subdivision.
 

Works included subgrade preparation, trimming and compaction, followed by the placement of recycled DGS40 subbase and DGB20 road base materials. These pavement layers were progressively spread, graded and compacted to establish a durable access route suitable for the development.

Stormwater Drainage & Water Management


APX Civil undertook the construction of stormwater drainage infrastructure designed to manage surface water runoff across the development and its new access road.
 

Works included excavation and installation of reinforced concrete stormwater pipes, precast and cast-in-situ drainage pits, concrete headwalls and associated scour protection.

Drainage swales and diversion channels were also formed and trimmed to direct surface water into the designated stormwater infrastructure while managing runoff across the surrounding landscape.

Environmental Protection & Site Rehabilitation​


Environmental management has been an important component of the project, with construction activities undertaken alongside requirements for vegetation protection, erosion control and cultural heritage management.
 

Works include the installation and maintenance of sediment fencing, stormwater inlet protection, stockpile management and surface water diversion measures.
 

The project also incorporates vegetation management, weed control, revegetation and hydroseeding of disturbed areas, supporting the long-term stabilisation and rehabilitation of the site.

Final Works & Project Progress


APX Civil is approaching the final stages of delivery, bringing together the earthworks, road construction, drainage and environmental management components of the development.

The North Marshall Mount Road project highlights APX Civil's capability to deliver coordinated civil infrastructure works across rural and residential developments, combining practical earthmoving solutions with quality road construction, drainage infrastructure and responsible environmental management.

TULLIMBAR COVER FRONT PAGE.jpg
bottom of page