17 Lot Residential Subdivision
Tullimbar NSW

APX has been contracted to develop one of the last parcels remaining in the heart of Tullimbar. The earthworks that we are undertaking will  support the

construction of 17 large house blocks and the creation of a new road which will run through the middle of the development.  

Client

Private

Region

South Coast

Status

Underway

 

Stage 1 of our Berrima st Tullimbar development consisted of site establishment including secure fencing, site office setup and driveway creation in conjunction with Sediment controls to protect the environment during operations. 
Minor demolition will include the removal of existing footpaths and water pipe/headwalls. 

The 2nd stage of the project involves stripping and the process to recompact approximately 9,500m³ of uncontrolled fill & the importation and placement of approximately 4,500³ of clean fill to raise levels.
The new sewer infrastructure will be installed which includes around 150m of 150mm PVC pipe, 17 property connections, and multiple such as 3 Ts, 1 MC, 1 MS, and 1 MH.
Water drainage infrastructure will be implemented to support the new laneway and residential lots, featuring 90m of 375mm diameterCP line, 80m of 150mm PVC line, and m of 100mm diameter sub drainage line, along with the installation of precast concrete stormwater pits and 1 large cast situ pit.

Stage 3 of the project will be installing 14 water road crossings and three water pipes on the same side to provide water services to the new lots. Electrical infrastructure will be installed to service these lots, along with the addition of three street lights to illuminate the new laneway.
Approximately 300 meters of NBN conduits and pits will also be installed to ensure reliable internet service for the new lots. Lastly, around 300 meters of gas conduit be put in place to provide gas services to the properties.

​Stage 4 will be constructing 900m² of asphalt road and laneway pavement, which will include a 270m flush concrete edge strip. Additionally, approximately 450m² of driveways, footpaths, and bin storage areas will be built.
A concrete sleeper retaining wall, measuring42m in length and 1.5m in height on average, will also be constructed.

Stage 5 will see landscaping works featuring around 1100m² of new turf, planting of 25 street trees, 130m² of new garden bed, and approximately 7700m² of hydromulch.

We will be rounding out the project with 500 meters of a 1-meter high picket fence, 150 meters of a 1.8-meter timber paling fence, 40 meters of a 1.8-meter lapped and capped fence and 50 meters of a 2.1-meter high lapped and capped fence and installation of street signage.

 